Project Overview
A 3-storey professional office building in Mississauga required a full door system overhaul to meet updated Ontario Fire Code requirements and improve accessibility.
Scope of Work
Installation of 8 fire-rated door assemblies, 3 automatic door operators at main entrances, and 12 interior office doors with commercial-grade hardware.
Results
The building passed its Fire Code inspection on the first attempt with full documentation provided. Tenant accessibility scores improved significantly.
“Arev managed the entire project from permit documentation to post-installation certification. Our building inspector was impressed by the quality of their paperwork.”
— Property Manager, Mississauga Office Complex